What Was Done
• Framing & Structure
The existing deck was fully removed and replaced with a reinforced frame built from pressure-treated lumber. Each joist and beam was aligned for optimal load capacity and long-term stability.
• Decking Installation
Premium composite decking was installed using hidden fasteners for a seamless, screw-free surface. Precision mitered corners and custom fascia wrapping define the craftsmanship and attention to geometric alignment.
• Stairs & Detailing
Low-profile steps were integrated into the design with the same decking material, achieving a cohesive, modern aesthetic. The layout supports smooth transitions from interior to exterior, making the space both practical and visually continuous.
• Finish & Protection
Every component was installed for maximum longevity and minimal maintenance — weather-resistant, fade-proof, and ready for year-round Northwest conditions.
Our Process
Step 1
Removed the existing deck and cleared the base for a new, code-compliant foundation.
Step 2
Installed pressure-treated framing and precise leveling to ensure long-term durability and water drainage.
Step 3
Laid boards with a hidden fastening system, creating a refined and uniform surface with seamless edges.
Step 4
Wrapped the deck edges and steps for a monolithic appearance with precise corner joinery.
Step 5
Each line and joint was reviewed to meet DM Construction Group’s standard of craftsmanship — structural integrity, clean design, and enduring beauty.









WHAT ABOUT YOUR PROJECT?Frequently Asked Questions
Usually 4–8 weeks depending on the size and scope.
No, we handle sourcing, delivery, and coordination.
Yes, most clients do. We minimize noise and dust.
Costs vary, but we provide a detailed estimate upfront.
Yes, we guide you through design and selections.
No, our team manages everything and keeps you updated.
EMAIL US WITH EASESubmit form

